Bringing an aging luxury residential high rise up to date in Santa Monica, California, architects and building owners face the challenge of keeping up with life safety requirements while preserving valuable space and managing construction costs.
Our experienced team knows how to optimize space, satisfy rigorous code requirements, and recognizes the value of customer relationships.
A deployable perimeter curtain was used in this two-story atrium to meet smoke control requirements.
Smoke containment in a hospital or medical facility is critical for both patients and staff in the event of an emergency.